|
Meetings
080428: SiD FCAL Meeting (agenda)
[people]
[Webex]
- Gunther - Chip fabrication - optimizing the fron-end
- Uriel - BCAL simulation (Si-W, 2.5mm x 2.5mm pixels) for benchmark point #3
(stau-stau production),
scale factor = 2 is used with Anti-DID at z = 295 cm
- John - LoI process - Global optimization (final version) in June 2008.
we need to know the subsystems (e.g., beam pipe, LUM cal, BEAM cal, Fcal etc)
2-3 months later along with its performance studies for sensors and readouts.
- Takashi - BG calculation with Anti-DID solenoid field.
Tracking simulation with anti-DID is in the task list, but will not be
ready for LoI.
- Bill - We stick to Be beampipe for LoI.
- Tom - Mechanical design - r = 20.
071106: SiD Benchmarking Meeting
[Talk: Stau Scenarios at ILC]
071022: ALCPG07
071005: FCAL Workshop
Physics - See a talk by Zhiqing Zhang (LAL)
Accelerator Parameters - Contact Vladimir Drugakov (Vladimir.Drugakov@desy.de)
BCAL Electronics - See a talk by Angel Abusleme (SLAC)
News
070214:
Both Nature and New Scientist have articles on the ILC RDR.
You can read them online at:
Nature
and
New
Scientist
The GDE has produced a companion document to explain the estimate.
This can be found at:
DOC
070208: ILC Reference Design Reort (NY Times)
070208: ILC Reference Design Reort (Science)
070207: ILC Reference Design Reort

|
SiD
|
|
1. StauStau at LC detector - FCAL
|
| Paper |
n/a
|
| Faculty | T. Kamon (TAMU) |
| Student | ??? (TAMU) |
|
|
|